Second Read

Your Medicaid Margin Was Decided When the Contract Was Signed, Not When the Claims Came In

InstrumentMedicaid Rate · AreaRevenue

A Medicaid plan is paid a capitation rate, and the rate is not the margin. The contract lays on a quality withhold, a risk corridor, a medical-loss-ratio floor with remittance and, in four of five large states we read, a profit-sharing schedule. The federal rule is only a frame: a state minimum MLR must be at or above 85%, and remittance is owed only if the state requires it (42 CFR 438.8(c) and (j)). Everything that bites is in the contract, fixed before the first claim is paid. Six things from building an instrument that settles one contract year in contract order.

1. The terms are a short option the plan wrote to the state. A gains-only corridor and an MLR floor cap a good year and pay nothing in a bad one, so the expected kept margin falls as volatility rises with expected cost unchanged. The illustrative contract our instrument opens on — a 2% withhold half earned back, a gains-only corridor, an 85% floor with remittance, 3 points of MLR volatility — leaves a 3.0% rate margin, 2.0% kept if the year lands on expectation, 1.4% expected across a volatile year. Fifty-four percent of the rate margin never reaches the plan.

2. The federal rule gives procedure, not terms. Risk sharing is documented in the contract and rate certification before the rating period and may not be changed after it starts (42 CFR 438.6(a), (b)(1)). No band, share or floor is standard: Florida's MMA contract sets an 85% MLR with no state remittance written in (Exhibit II-A, July 2026); Pennsylvania's physical-health agreement sets 85% with remittance required (Appendix 3h, 2026). A forecast built on other contracts is built on nothing.

3. Profit sharing is a schedule, and the bands differ by state. Texas keeps 100% of pre-tax income to 3% of revenue, then 80%, 60%, 40% and 20% in bands to 5, 7, 9 and 12%, nothing above (Uniform Managed Care Contract, Attachment A v2.45, §10.10): a 6% margin keeps 5.2%. Florida keeps 100% to 5%, half from 5 to 10%, none above, plus 1% of revenue for quality (Fla. Stat. 409.967(3)). California's share is spent on community reinvestment, not remitted (boilerplate Exhibit B 1.1.17–1.1.18), and the kept margin is the same either way. In New York we found no current profit cap; the HARP 1.5% limit ended 31 December 2017.

4. The blend can look adequate while the cells are not. Rates are specific to each rate cell and one cell may not cross-subsidize another (42 CFR 438.4(b)(4)–(5)). In the illustrative book the TANF cells are priced with room and the expansion, disability and long-term-care cells are underpriced; remove 20% of TANF member months and the blend turns inadequate with no cell's cost moving. The mix is the Populations instrument's; this is its contract consequence.

5. Order matters, and earn-back is a record, not an assumption. Settlement runs withhold, corridor, then the floor tested on revenue after the corridor, because net risk-sharing payments count in premium revenue (438.8(f)(2)(vi)); an incentive payment, capped at 105% of capitation (438.6(b)(2)), comes last. Our instrument raises a finding when full earn-back is typed without the plan's own measure record behind it.

6. The margin record says this is live. Milliman's series of 186 MCOs in 38 states puts the 2025 underwriting margin at −0.1% after −0.6% in 2024, roughly half of plans in loss, against +2.5 to 3.5% in 2021–2023 (June 2026). At those margins the gap between rate margin and kept margin is the whole P&L, and it belongs to whoever signed the terms.

We built these into an instrument: the settlement in contract order — withhold, corridor, MLR floor with remittance, then a profit-sharing schedule of up to six bands and an incentive pool net of its offset; the payoff line, margin kept against actual MLR with the rate margin dashed beside it; the three tiles; per-cell adequacy and the disenrollment probe; and five state presets that fill only declared terms. It sets no rate; the board carries the kept figure, never the rate margin.

The rate is what the state pays. The margin is what the contract lets you keep, and the contract was written first.

Who in your building has read this year's corridor bands and sharing schedule into the forecast — and in which order did they settle them?

Share on LinkedIn

All writing