The 2027 Medicare Advantage P&L Was Settled Before 2027 Began

TopicMedicare Advantage · AreaLines of business

A Medicare Advantage plan's revenue for contract year 2027 was fixed by a sequence of dates, and nearly all of them fell in 2026. The benchmark was announced on 6 April 2026; the bid, and the benefit design with it, locked on the first Monday of June under 42 CFR 422.254; the risk score that multiplies the two was built from 2026 dates of service; the star bonus inside it came from performance measured a year earlier still. Six things from building four instruments around that calendar.

1. The base payment was fixed seven months early, from a draft that moved. The Advance Notice in January 2026 put the overall expected average change at 0.09%; the final on 6 April came in at 2.48% (CMS CY2027 Rate Announcement fact sheet; the effective growth rate, a different line, moved 4.97% to 5.33%). Per standardized member, 2027 revenue is county FFS × a quartile percentage of 95 to 115% × any star bonus, with 50, 65 or 70 percent of the savings under it returned as a rebate spent on enrollees (SSA § 1853(n)(2); 42 CFR 422.266(a)(2)(ii)).

2. The product budget was the same decision, under a tether. The rebate is all of the benefit money, and the $40.00 per member per month Total Beneficiary Cost threshold (CMS Part C bid review memoranda, CY2026 and CY2027) chained the 2027 design to 2026's. Late July opened a roughly one-week reallocation window, the last touch; the election period ran 15 October to 7 December (42 CFR 422.62). A benefit that underperforms in March 2027 is a June 2026 decision nobody can reopen.

3. The 2027 risk score is 2026's chart. A member without twelve months of Part A and Part B in the base year is paid on the demographic-only new-enrollee model for a year; a switcher is paid on last year's coded diagnoses, often the prior plan's (CMS Report to Congress on risk adjustment, December 2024, §2.6.2). The v28 model reached full phase-in for 2026, priced by CMS at −3.12% (CY2024 Rate Announcement); the CY2027 announcement declined a further update and excluded audio-only and unlinked chart-review diagnoses, −1.53% program-wide. What remains open in 2027 is validation and deletion, which face backward.

4. The star money in the 2027 benchmark was earned two years ago; the 2027 ratings pay in 2028. CMS published the 2027 Star Ratings on 8 October 2026, with about 71% of MA-PD enrollees in contracts at four stars or more, cut points recalculated after the measurement period ended (CMS fact sheet on the 2027 Star Ratings, 8 October 2026, read 9 November 2026). Those ratings set the 5-percentage-point benchmark bonus (42 CFR 422.258(d)(7)) and the rebate share in the bid due June 2027.

5. Membership is the one revenue line still open on 1 January, and it arrives discounted. The election period decides most of it; the January-to-March open enrollment period (42 CFR 422.62) decides the rest. Special-needs plans carried 85% of net MA growth in 2026 (KFF), and a member new to Medicare brings demographic-only revenue for twelve months while the CY2027 schedule allows up to $725 initial commission at enrollment (CMS memo, 1 June 2026). Growth lifts the top line and lowers the margin for a year.

6. We could not find anyone who checked whether the June number was right. The last independent comparison of bid margins with results is GAO's 2013 work (4.1% projected, 6.6% earned, 2006 data); in a search on 26 October 2026 we did not identify a later one. What the plan owns in 2027 is medical cost, administrative cost and conduct, a span the P&L Simulator draws as thinner than one year of rate weather at ±3% of revenue. The temptation we refuse is a mid-year revenue reforecast dressed as management.

The instruments that carry this: Rate's The walk, rate year CY2027, with the tick for a projection still using Advance Notice numbers as final; Product's The clock, the proposed TBC change against the $40.00 threshold; Risk Adjustment's Channels, the share of unlinked revenue the CY2027 switcher exception covers; Quality Revenue's measure table, where a cut copied from last year carries the prior-year tick. Browser-only; nothing entered leaves the machine.

By the time a plan year opens, its revenue is history; what a plan manages in-year is cost and conduct.

Which of your 2027 revenue assumptions was last changed after June 2026, and who in your building has looked?